The late Bob Murphy, one of the original voices of the Mets' broadcast team, used to say "we'll be back with the happy recap" after a Mets win. That's kind of what I feel like writing after the Amherst Railway Society show, January 29-31, 2016. A very happy recap.
First of all, I can't thank NE Free-mo enough for organizing the setup. A main line over 250 feet long (about four HO scale miles), a branch of over 75 feet. Extensive operations on both Saturday and Sunday. Plenty of free time (and space) to run trains. What an amazing event and what an amazing group of people. See the .pdf of the layout.
Setup on Friday took about eight hours. That didn't include a couple of wiring issues, but when you're building a layout that size, you have to expect a couple of glitches. The postmortem after the show highlighted a few things that they're going to do differently next year. Break down on Sunday took about two hours. I was packed in about half an hour, but stayed to help out; there was a lot to do and everybody pitched in.
Overview of the layout - photo credit Mike McNamara |
A great panoramic shot of the layout - photo credit Mike McNamara |
My module was by no means complete, but was in much better shape than the previous year and in addition, I gained plenty of knowledge to give me confidence that I can complete it before the National Train Show in Indianapolis in early July (yes, I'm planning on going). I still have to put down real foundations, sidewalks and roads, as well as finish scenicing the western half of the module. I also have to do a little wiring to bring the module up to the new standard.
Overview of Naugatuck North - my photo |
Two nicer shots of Naugatuck North - photo credits Mike McNamara |
With respect to operations, I ran several trains including the New England Fast flyer; a passenger train that covered the entire layout twice.
The New England Fast Flyer; my power, not my equipment :) |