I wanted to publish a few photos of the NMRA-standard module I built for the Allegheny Western Lines meet in August of 2013. The module was completely barebones for the meet, but functioned properly (more or less) during the meet.
The concept is a gravel pit (Valley Aggregates) with a single siding for loading the crushed stone. There's still a lot of work to do with the module, but I'm happy that I was able to build something that actually met the NMRA standard and worked within a setup.
Showing posts with label NMRA. Show all posts
Showing posts with label NMRA. Show all posts
Friday, February 7, 2014
Allegheny Western Lines
I would be remiss if I didn't take some time to thank the Allegheny Western Lines group out of Fort Washington, PA (near Philly). I got to spend some time with them in early 2004, before moving to Florida. Since returning north, they've been more than generous to allow me to operate on their NMRA standard modular layout several times at Greenburg shows in Edison, NJ.
In August of 2013, they were kind enough to allow me to bring a module to their setup. I have photos and descriptions of that module in a separate blog thread, but I wanted to include some photos of the 8/13 setup.
Subscribe to:
Posts (Atom)








